Projects - 2014

Cascade Middle School

 There are several products that we typically install that we were not awarded on this project but we installed 200 squares of AEP Span's Span Lok panels. We also put on miscellaneous sheet metal flashing and trim around the building. 

Chinook Middle School

 This is a pretty standard project for us. We installed 110 squares of AEP Span's Mini-V Beam wall panels and 35 squares of AEP Span's PS12 soffit panels. In addition, we installed all of the z-furring supports. 

Harrison Prep

 On this project, we installed a variety of different panels.  Majority of the panels are 365 squares of Metal Sales T10-A corrugated panels in two different colors.  We also installed 85 squares of Metal Sales Soffit panels.  In addition to metal wall panels, we installed 120 squares of Trespa Meteon panels.  The 140 square roof will be Metal Sales Magna Loc panels. 

Kirkland Public Safety Building

 This was the first time that we installed the Hardie Panel Reveal System.  In addition to 53 squares of this system, we also installed 15 squares of lap siding as well as the sheet metal on the roof. 

Shorecrest High School

 This was a great size wall panel project for us. We installed 18 squares of Una Clad composite panels, 40 squares of AEP Span's PS12 soffit panels, 100 squares of AEP Span's PS12 wall panels and 600 squares of AEP Span's Nu Wave panels. We also installed 60 squares of Trespa phenolic resin panel soffits.